Comparison: This is what a network would look like if an estimated 5 billion Euro were to be spent on the proposed Metro North (black line).
The Bus Rapid Transit model network is intended as an option to the proposed metro north (see right), which would deliver dramatically less network coverage at similar (possibly much more) cost.
All content © Aris Venetikidis 2011
Aris Venetikidis
aris.v [at] mac.com